Pump replacement brings energy savings

Grundfos Pumps, quick fixes
Huge energy savings have been achieved in a German hospital following the replacement of the existing pumps.

Replacing pumps in a 238-bed hospital in Germany has reduced energy consumption by 40 MWh a year following a pump audit carried out by Grundfos Pumps. Salem Hospital in Heidelberg was built in the 1970s, and the audit discovered that the existing pumps were tremendously oversized, which is often the case in older buildings. They were also far less efficient than today’s high-efficiency speed-controlled pumps.

Grundfos explains that even pumps that are only five to 10 years old can be outdated, as modern speed-controlled pumps ensure that flow and pressure are always precisely adapted to actual demand, providing greater energy efficiency and significant savings — so even smaller upgrades can be worthwhile.

For more information on this story, click here: October 2012, 106
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.