Durapipe provides care for Berkshire hospital

Durapipe, pipework, plastic

Durapipe’s HTA pipework has been installed in a physiotherapy and rehabilitation clinic at Upton Hospital, Slough, to deliver hot and cold water from three new boiler houses to existing sanitary ware in three wings of the hospital. It has been installed in sizes from 20 to 40 mm.

The work was carried out by SSE Contracting of Farnborough. This pipework has excellent resistance to corrosion and limescale, avoiding costly maintenance and replacement work. Installation benefits include light weight and quick and simple cold-welding jointing — avoiding the need for hot works.

For more information on this story, click here: August 2013, 124
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).