WEMS helps BT reduce peak electricity demand

WEMS (Wireless Energy Management Systems International) has been awarded a significant contract by BT as part of a major programme to reduce electricity demand at peak times. The project will enable BT to reduce its electricity demand during periods of peak demand, enabling National Grid to use power more efficiently.

WEMS’s wireless technology will monitor the status of engine sets and engine tanks at 415 sites. An automatic and gated switching process controlled by WEMS’s hardware ensures all necessary checks have been made before the generators are started to reduce demand on the grid.

The relationship between BT and WEMS spans 20 years, during which time WEMS has provided advanced energy-management and monitoring technology at over 2300 BT sites and achieved energy savings of £15.8 million a year.

For more information on this story, click here: February 2014, 86
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.