Hamworthy is a winner at Cheltenham racecourse

Hamworthy Heating, boiler, space heating

When the plant room at Cheltenham racecourse needed upgrading, local contractor Mechanical Installation Heating Services (MIH) called in Hamworthy Heating and its area sales manager to help evaluate the current system and propose a solution. The main grandstand accommodates some 6800 people in bars, restaurants and private boxes. The old, inefficient blown-gas boilers were coming to the end of their operational life.

MIH installed six Wessex ModuMax 250 kW gas-fired condensing boilers. They provide space heating and are the primary heat source for a Powerstock PS300 calorifier and two 2000 l hot-water cylinders. The Modumax boilers are stacked three high to fit the available space.

The boilers were commissioned by a Hamworthy-approved service engineer.

For more information on this story, click here: Feb 2014, 121
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.