Bitzer delivers cooling for Sochi Winter Games

Bitzer, Sochi, winter Olympic games, compressor, air conditioning
The refrigeration and air-conditioning requirements of five stadiums at the Sochi Winter Olympic Games were met using Bitzer screw compressors.

Bitzer screw compressors played a key role in the refrigeration and air-conditioning systems delivered by Finnish manufacturer Suomen Tekojää Oy for five stadiums of the Olympic Winter Games at Sochi. Established in 1997, the company has built refrigeration systems for over a hundred ice rinks in Russia and around 500 worldwide.

The projects were as follows

• Shayba Arena: four CSH (ice surface) and six CSH compressors (air conditioning). ‘Shayba’ is the Russian word for the puck used in ice hockey.

• Ice-hockey training stadium: four CSH (ice surface) and two CSH compressors (air conditioning).

• Figure-skating training stadium: four CSH (ice surface) and two CSH compressors (air conditioning).

• Curling arena: three HSK (ice surface), three HSK (air conditioning) and three HSK compressors for either function.

• Bobsleigh training stadium: four CSH (ice surface).

To ensure that everything ran to plan, a back-up system was installed for each refrigeration system.

For more information on this story, click here: April 2014, 133
Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.