RAF station converts from oil to biomass

maintenance, refurbishment, boiler, space heating, biomass, renewable energy, Remeha
RAF Brize North has replace several oil-fired boiler swith biomass boilers from Remeha.

As part of a project to replace existing oil boilers at RAF Brize Norton, Remeha has supplied six Gilles biomass boilers with a total output of 775 kW and using 290 t of wood pellets a year. They replace oil-fired boilers using about 145 000 l of oil a year and are reducing carbon emissions by around 309 t a year.

The biomass boilers range in size from 35 to 290 kW.

The first biomass boilers at the station were in Building 305, the emergency response centre. It now has two 75 kW biomass boilers.

Dave Hart, project leader at Team Q, oversaw the project. He said, ‘The biomass installations are all running smoothly and constantly with no need for gas or oil back-up.’

For more information on this story, click here: July 2014, 85
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).