Shouksmith lands health care project in Chester

Shouksmith
Pictured at the Gorse Stacks project in Chester are (left) Geraint Morgan, group commercial director with Watkin Jones Group, and David Shouksmith, director of J H Shouksmith and Sons Ltd.

Building-services company Shouksmith & Sons has been awarded a £2.7 million contract for the design and installation of the M&E package of the Gorse Stacks primary health-care centre in Chester. The health-care centre is the first phase of the development of the Gorse Stacks site. Further phases planned for the future will include offices and 42 residential units.

Features of the current project include a full building-management systems and two plant rooms, one of which will house a CHP unit.

The contract was awarded by Watkin Jones Group and comprises a large reception area, pharmacy, café, waiting areas on all five floors, consulting rooms, treatment rooms and a 3-level underground car park.

This contract follows the handing over to Watkin Jones special-projects division of a student accommodation block in Swansea. The £1.3 million project comprised full M&E design and installation for the 382-room block and included prefabricated bathroom pods and a highly efficient water-booster system.

Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).