Weger re-equips Kennet Leisure Centre

AHU, leisure centre, maintenance, refurbishment, swimming pool, Weger
The new air-handling and dehumidification equipment for Kennet Leisure Centre has been supplied by Weger Air Solutions.

Weger Air Solutions has supplied new air-handling and dehumidification equipment for Kennet Leisure Centre in Berkshire The replacement was made necessary by the high levels of moisture and chemicals in the air taking their inevitable toll on the previous equipment.

The Weger unit is rated at 7.28 m3/s and has a duplex heat recuperator that was carefully selected to achieve an efficiency of 96.5% at design conditions and recover 296 kW of heat.

The unit was supplied partly in sections and in flat-pack components that could pass through an opening of 2.5 x 1 m. Assembly on site took only three days to meet a very tight project programme.

The comprehensive controls package enables the equipment to work from 100% fresh air to 100% recirculation. Design conditions are a pool-hall temperature of 30°C and an RH of 60%, as recommended by the English Sports Council.

For more information on this story, click here: December 2014, 87
Related links:
Related articles:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.