Munters optimises climate conditions for hydrotherapy pool

Munters, climate control, hydrotherapy, dehumidification

A Munters ProkPool unit now controls the indoor environment of a special-needs swimming pool at a primary school in Scotland, having replaced a unit that was outdated and in poor condition. The 30 m2 hydrotherapy pool at Hillside Primary School in Cummock, East Ayrshire, is used by the school and local community.

The new unit enables a member of staff to adjust the temperature and control the humidity within the pool hall within a varying level, over and above the capabilities of the original unit.

David McCreath of East Ayrshire Council says, ‘The new unit was easy to set up and control, and there have been no problems since it was commissioned.’

The council has since implemented Munters solutions in other schools for a similar purpose.

For more information on this story, click here: April 2015, 122
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.