Mikrofill heats new school buildings

Mikrofill, boilers, space heating

New buildings at Newport Girls’ High School in Shropshire have their heating requirements met by two Ethos boilers from Mikrofill. The extension to the school includes classrooms, multi-purpose sports hall/assembly room and changing facilities.

The boilers were installed by mechanical contractor Dodd Group of Telford. There are two Ethos FS 350 kW stainless-steel condensing boilers (pictured) with dual-burner technology and a turndown ratio of 20:1. They have a seasonal efficiency of 96%.

Also installed was a Mikrofill pressurisation package, electronic filling device (EFD), expansion vessel and service isolation drain valve.The boilers provide heating for the new extension and parts of the original building

For more information on this story, click here: May 2015, 82
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).