Wieland delivers structured cabling for Canada House

Wieland, structured cabling, structured wiring, electrical
Simplifying the installation of lighting and electrical services for the Canadian High Commission is Wieland Electric’s Metalynx2 structure wiring system.

Wieland Electric’s Metalynx2 structured wiring system was the preferred choice to connect power and lighting at the refurbished Canadian High Commission building in London. The refurbishment includes a complete new lighting system and is the amalgamation of two buildings occupied by the Canadian High Commission.

The power and lighting systems were installed by Bancroft, which specified the Metalynx2 armoured cabling system, which allowed for home runs to continue along the ceiling power-containment route.

Fan-coil units and lighting-control modules are fed using Wieland’s extenders, tees and fused spurs.

The pluggable functionality of Metalynx2 maximised productivity on site as the pre-wired pre-tested system is made at Wieland’s factory so that on-site installation time simply involves plugging the system together.

For more information on this story, click here: May 2015, 138
Related links:
Related articles:



modbs tv logo

BSRIA reports sustained global cooling demand as market diverges

BSRIA has released its latest analysis of the global cooling sector. The BSRIA Worldwide Air Conditioning and Heat Pump reports reveal a complex and diverging global cooling market.

CABE awards two new accolades alongside 2026 Honorary Fellowship

At the CABE presidential inauguration on 8th May, the Association was delighted to present two new awards for 2026 alongside its Honorary Fellowship for this year.