Panasonic takes off at GE Aviation

air conditioning, Panasonic

The latest stage of the long-term programme to replace HVAC systems to improve energy efficiency at the aviation headquarters of GE Aviation involved the installation of Panasonic’s recently developed PACi range of indoor and outdoor units. Eight PACi Elite 14 kW units were installed outdoors, with four under-ceiling units and four wall-ducted systems indoors. A further 28 kW of PACi cooling technology has been installed in the factory. R410A is the refrigerant.

GE Aviation provides jet and turbo engines. The work was carried out by Swift Express Maintenance of Bristol, which worked with GE Aviation 20 years previously when the initial heating, cooling, ventilation and air-conditioning equipment had been installed.

When replacement was required, Swift Express was asked to design and specify a solution with good efficiency capabilities, working to high demands and to the specific temperatures required for the heavy-duty work carried out at this aviation headquarters.

Owing to the delicate environment and equipment handled by GE Aviation, a fire watch of four hours is required for hot works, so Swift Express opted to use the Reflok aluminium piping system with the Panasonic equipment.

Josh Muschamp, who is responsible for business development with Swift Express, says, ‘Since the initial install five years ago, Panasonic’s heating and cooling systems haven’t stopped or had any problems. We have worked with Panasonic for many years and have never incurred any technical problems with its kit. That is why we chose to specify their range of PACi air-conditioning units for this prestigious project.’

For more information on this story, click here: June 2015, 84
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.