Dundee Hospital tackles boiler dry cycling

boiler, heating, space, DHW, dry cycling, Sabien Technolgy

Preventing boiler dry cycling at the King’s Cross Hospital in Dundee has achieved average fuel savings of 7% with a payback of 1.8 years. Sabien Technology verified the savings for its M2G boiler-load optimisation controls for NHS Tayside.

Delivering cost savings is a key area of focus for NHS Tayside,’ explains its energy co-ordinator John Ruddy. ‘We decided to verify what savings M2G could deliver, and we are pleased with the outcome.’

Installation work has no impact on clinical practice, enabling all areas of the hospital to function as usual.

The measurement and verification project involved M2G units being installed on Hamworthy Wessex 200HE, Hoval Ultragas 500 and Hamworthy Purewell Classic boilers. Sabien’s M1G was also installed on the hospital’s direct-fired water heaters. Energy consumption was compared to previous consumption, using degree-day data to allow for weather variation.

For more information on this story, click here: January 2016, 80
Related links:
Related articles:



modbs tv logo

Nuaire celebrates long service and a people-first culture built over decades

Nuaire has celebrated the exceptional loyalty and dedication of its employees at a long service awards event – a powerful reflection of a workplace culture that has been built and sustained over generations.

New advanced training facility opens to upskill HVAC industry

A new education facility has opened its doors and is set to advance skills and knowledge across the UK’s HVAC industry.