The show goes on during theatre refurbishment

Steven Hunt & Associates, consultant, consultancy

Act II of the refurbishment of Liverpool’s Royal Court Theatre includes building-services designed by Steven Hunt & Associates. The building-services scheme was designed as a heavily phased operational refurbishment so that the theatre could remain open without any risk of outages in the auditorium.

The scheme includes a new power supply with new switchgear and replacement of the 1938 distribution panel, which has been made safe and retained for historic interest.

All lighting is based on LEDs, with some existing fittings retained and rewired. Lighting in the foyer and public space on the ground floor has been fitted with scene-setting controls for different occasions.

The mechanical installation has intelligent controls to monitor and adjust the heating and mechanical ventilation, with heat recovery for energy efficiency.

Related links:
Related articles:



modbs tv logo

Fujitsu General Air Conditioning becomes GENERAL HVAC Solutions UK

Fujitsu General Air Conditioning (UK) has become GENERAL HVAC Solutions UK from 1st January 2026, strengthening its long-term position within the global Paloma Rheem Holdings (PRH) group.

Market performance indicates encouraging signs for future of BEMS sector

Highlighting an increased desire from property developers, architects and designers to decarbonise the UK’s building stock through the specification and implementation of building controls and automation, the building energy management systems (BEMS) market showed steady progress in Q3 – rising 2.6% compared to the previous quarter.