Ferroli gives a lesson in space-saving boilers

Ferroli
Replacing seven life-expired boilers at Wigan & Leigh College are two space-saving GN 4N cast-iron boilers from Ferroli.
Because Ferroli holds all sections for its GN range of cast-iron boilers in the UK, it was possible to make and deliver two large boilers for Wigan & Leigh College very quickly. These two boilers each have an output of 590 kW, and they have replaced seven life-expired boilers. Given the restricted space in the plant room, the compact design of these high-efficiency GN 4N boilers and cleaning and servicing from the front were important benefits. Each boiler for this project comprises 12 sections, and they were installed by M&E contractor Tudor (NW) of Wigan. This range of boilers is available in eight sizes from 120 to 650 kW. Burner options are on/off, high/low and fully modulating. Features include a 3-pass flueway for maximum heat transfer and a choice of low-return tapping configuration to suit the system application. All GN 4N boilers are delivered in sections, and an on-site assembly services can be provided.
Related links:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.