Making light work of installing lighting

Flexconnectors
A flexible and energy-saving lighting installation in new premises for Matthew Boulton College in Birmingham has been achieved using products from Flex Connectors.
Lighting connection and control products, extra-low-voltage switching, connection units and prefabricated chains of sockets from Flex Connectors have been used on all nine floors of the new £40 million premises of Matthew Boulton College in Birmingham. The building includes classrooms, meeting rooms, a library and an operating theatre. It enables the college to expand its healthcare, medical and IT facilities. Contractor Interserve Engineering Services chose the Flex 7 range as an energy-saving solution that is adaptable enough to accommodate complex installation requirements, including combining occupancy sensing with options for over-ride switching. The project also uses Flexishield pre-wired conduit instead of standard flexible metal conduit.
Related links:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.