Making light work of installing lighting

Flexconnectors
A flexible and energy-saving lighting installation in new premises for Matthew Boulton College in Birmingham has been achieved using products from Flex Connectors.
Lighting connection and control products, extra-low-voltage switching, connection units and prefabricated chains of sockets from Flex Connectors have been used on all nine floors of the new £40 million premises of Matthew Boulton College in Birmingham. The building includes classrooms, meeting rooms, a library and an operating theatre. It enables the college to expand its healthcare, medical and IT facilities. Contractor Interserve Engineering Services chose the Flex 7 range as an energy-saving solution that is adaptable enough to accommodate complex installation requirements, including combining occupancy sensing with options for over-ride switching. The project also uses Flexishield pre-wired conduit instead of standard flexible metal conduit.
Related links:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.