Fast delivery time wins boiler contract

Ferroli
Replacing coal-fired plant on an educational site in Wigan are these two Ferroli gas-fired cast-iron boilers, each with an output of 590 kW.
The ability to deliver two cast-iron boilers in two weeks, each with an output of 590 kW, led to Ferroli winning a contract to replace three outdated coal-fired boilers at an educational site in Wigan. These gas-fired boilers serve the heating needs of Brookfield High School and Park Centre Teacher Training College. The installation by local contractor Tudor (NW) Ltd, includes a control system to switch off the heating in either building as required. GN4N boilers, as used on this project, are delivered in sections, and an on-site assembly service is available if required. All cleaning and servicing is carried out from the front, so only minimal side clearances are required. They have a 3-pass flueway for maximum heat transfer and high operating efficiency.
Related links:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.