Crane valves reach new heights

Crane
Hundreds of valves are being supplied by Crane for system balancing and isolation in what will be Britain’s tallest residential building.
Britain’s tallest residential building, the 47-storey Beetham Tower in Manchester, has its hydronic balancing and isolation requirements served by Crane Valves. At 150 m high, this glass-clad tower will be 30 m higher than the Barbican in central London. A futuristic glass-blade feature increases the overall height to 171 m. Crane Fluid Systems is supplying many hundreds of balancing and isolation valves for the plant rooms and chilled-water and heating systems. The tower will comprise a 285-bed Hilton Hotel taking up 23 floors. There will also be 219 apartments, including 16 penthouses, with views across Greater Manchester and as far away as Snowdonia, Blackpool and Liverpool.
Related links:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.