Plastic pipe brings new life to district heating

Flexenergy, district heating, pipework, preinsulated

The lifecycle and environmental benefits of pre-insulated polybutene pipe technology were the main reasons for it replacing legacy steel pipe in a district-heating scheme in Wandsworth. A total of 1140 m of the pipe was supplied by Flexenergy after the steel network was coming to the end of its useful life.

The new pre-insulated pipe will improve thermal efficiency. It is also recyclable and has a longer life than steel. The system helps meet the heating and hot-water needs of over 160 households.

Sandy Fairley, sales director with Flexenergy, says, Many contractors are now choosing our fully welded, all-plastic, corrosion-free pipework for district-heating schemes. It can handle flow temperatures of 70°C for an estimated 98 years.’

For more information on this story, click here: Sept 2017, 125
Related links:
Related articles:



modbs tv logo

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.

Six in 10 UK businesses look to adapt operations in response to extreme heat

According to the Q2 Barclays Business Prosperity Index, six in 10 businesses surveyed (60%) have either increased investment to adapt to extreme heat (37%) or are considering doing so (23%).