Electric radiant heating slashes church energy bill

Tansun, space heating, heating, radiant heating, electric heating, church heating

The installation of Tansun infra-red electric radiant heaters to replace underfloor heating at a church in Wolverhampton has reduced energy costs by over 75%. St Michael’s Church was looking for a heating solution that did not require long preheat periods of up to three days.

Annual heating costs of £4295 for the old system were reduced to £889 by the Tansun system. The savings for December and February were particularly impressive. A bill of £1546 for December was reduced to £254, and for February the reduction was from £1050 to £153.

Tansun advised that each area of the church would require a different heating solution, so a variety of heaters with different outputs was installed. Apollo heaters are available with outputs of 6, 9 and 12 kW for 3-phase operation.

A range of brakets enables the heaters to be mounted at the appropriate angle.

For more information on this story, click here: Sept 2017, 126
Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.