Viega adds to Megapress connections range

Megapress, Pipework, Viega

Viega has extended its unique range of Megapress press connections with an innovation engineered for larger thick walled steel pipework. The new cold applied Megapress XL system is safer, cleaner and delivers time savings of up to 80% when compared with welding.

Megapress XL allows thick walled steel tube with diameters between 2½ and 4 inches to be press connected. The specially engineered sealing element within the connector ensures a robust, leak proof seal on a range of materials including seamless, welded, black, galvanised, epoxy-resin-coated and industrially painted tube.

As a cold applied press connection system, Megapress XL eliminates the fire and burn risks associated with welding and the heavy machinery needed to create a threaded tube.

The zinc-nickel coated steel connectors are suitable for applications including heating and cooling systems and is rated for operating temperatures up to 140°C. An extensive range of sleeves, elbows, adapters, reducers, T-pieces and flanges provides flexibility to meet the demands of any installation.

Viega’s compact pressgun allows easy installation, even for overhead pipework or where space is limited. The lightweight Pressgun press booster, developed for use with larger Megapress XL connections is compatible with existing Viega tools and has been designed for easy use.

For more information on this story, click here: December 2017, 165
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.