Trox X-Cube solution for Huddersfield University

Trox

Trox X-Cube air handling units have been chosen for an awardwinning new building at to the University of Huddersfield. Sustainability was a priority for the £28 million Oastler Building, and the Trox air handling units at the heart of the HVAC system contribute to the energy efficient building, which has achieved a BREEAM Excellent rating.

The design of the different zones, and the diversity of usages throughout the Oastler Building, create a significant air management challenge. Air handing and ventilation demands vary from dynamic social spaces and lecture rooms, to long, tall corridors and individual study booths for language students requiring sound attenuation.

The X-Cube’s integral variable flow control facilitates room-byroom air management, adjusting automatically to requirements. It connects seamlessly to a centralised BMS (via Modbus TCP, Ethernet or BACnet), the X-Cube’s built-in control technology (available as standard) avoids the need for complex or expensive bespoke programming of the BMS. Estates management professionals and building services engineers can interface with the AHU via touchscreen, remote control or web browser.

For more information on this story, click here: May 2018, 125
Related links:
Related articles:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.