Online VRF design with Toshiba DesignAirs

Toshiba DesignAirs, VRF

Toshiba Air Conditioning has launched an updated version of its VRF air conditioning design platform, DesignAirs, for use by contractors, designers and consultants. Toshiba Air Conditioning UK is a part of UTC Climate, Controls & Security, a unit of United Technologies Corp.

DesignAirs enables users to create detailed project drawings, including pipework and equipment specifications, for a variety of building types. It now includes a new seasonal performance calculator to simulate the actual performance and running costs of a system using local seasonal temperatures and operating conditions.

Users can also specify different electricity tariffs, in order to estimate running costs under different supply scenarios and produce a report on anticipated running costs and annual CO2 emissions.

The design platform has three-dimensional capabilities that can be used to highlight any potential issues with a design in relation to oil traps and height difference separation. The new DesignAirs system can generate a single page view showing all elements of a system, either as a PDF or an AutoCAD file.

Alongside the introduction of the enhanced DesignAirs, the company has issued updated Building Information Modelling (BIM) software for use with Autodesk Revit, an industry standard BIM platform.

For more information on this story, click here: September 2018, 169
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.