Mikrofill supports refurbishment at hospital

 Mikrofill, John Black Day Hospital, boilers, Mikrovent, Waterman Group, LPHW system, pressurisation

Mikrofill has supplied a range of its products for the refurbishment of John Black Day Hospital in the West Midlands. The hospital, which provides mental health services, has undergone transformation from an in-patient to an out-patient facility. This included refurbishment of its building services.

The existing cast iron atmospheric boilers were replaced with 3No Ethos 110kW wall mounted condensing boilers as well as a Mikrovent 400 low loss header/air, dirt separator. The stainless steel boilers were installed on free standing frames and provide comfortable space heating throughout the reconfigured wings.

The building services design was carried out by Waterman Group (B/ham) and installed by Ward Services (Warwickshire). In addition, the new LPHW system is unvented by way of a pre-commissioned Mikrofilll 400 pressurisation package.

For more information on this story, click here: July 2019, 124
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).