SES helps refurbish Pimlico district heating

boiler lift
A 27 t boiler is craned into position by M&E contractor SES as part of the £2.5 million of building-services work in the refurbishment of the Pimlico district-heating scheme in London. The contract includes the installation of three new 27 t boilers, two CHP engines and associated equipment to the existing pump house on the north side of the River Thames. Each 17 t CHP engine can produce 2 MW of electricity, and each boiler is rated at 8 MW. They serve 3200 dwellings and 40 commercial premises with heating and hot water. This plant replaces equipment next to the Battersea Power Station site, with heating and hot water delivered through 55-year-old pipelines under the River Thames.
Related links:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.