Hospital benefits from motorised commissioning valves

crane
300 motorised balancing valves have been supplied by Crane for a hospital in south London.
The commissioning requirements of a new hospital in Lewisham are met by a range of valves from Crane Fluid Systems. They include 300 motorised fixed-orifice double-regulating valves. These D981 MotoBalance units combine actuated regulation and flow measurement for the heating and cooling systems. A single unit provides the functions of measurement, regulation, presetting and isolation, allowing faster commissioning and greater accuracy. Crane also supplied a hundred Z3000 Dominator pre-assembled combination valve units for the fan-coil units. MotoBalance valves are incorporated in some Dominator units instead of manually operated commissioning sets. The Lewisham Hospital construction is a £70 million PFI project. It is the third phase of development at the hospital and will provide 400 in-patient beds, four operating theatres and a critical-care complex. Construction is scheduled to completion at the end of 2006.
Related links:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).