Air conditioning reaches new heights in Malaysia

Telekom Tower
Hiross underfloor air conditioning is being installed in the new 60-storey building of Malaysia Telecom in Malaysia to provide an environmentally friendly system and flexibility to respond to future ‘churn’. Work on installing the air conditioning began as the building reached its 40th floor. A total of 60 000 m2 is to be air conditioned by 280 zone units with 1500 air-supply terminals recessed into the floor and 6000 grilles. It will be controlled by a Hiromatic system with Hirolink interface to the building-management system. AET won the order for the project. Tel. 01342 310400



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.