Air conditioning reaches new heights in Malaysia

Telekom Tower
Hiross underfloor air conditioning is being installed in the new 60-storey building of Malaysia Telecom in Malaysia to provide an environmentally friendly system and flexibility to respond to future ‘churn’. Work on installing the air conditioning began as the building reached its 40th floor. A total of 60 000 m2 is to be air conditioned by 280 zone units with 1500 air-supply terminals recessed into the floor and 6000 grilles. It will be controlled by a Hiromatic system with Hirolink interface to the building-management system. AET won the order for the project. Tel. 01342 310400



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.