T5 chooses ammonia chillers from York

T5
Ammonia chillers with a capacity of 6.6 MW are to be supplied for the Terminal 5 development at Heathrow airport by York International. The four chillers will be delivered to site in December and form the first phase of the installation. They were chosen because ammonia has no global-warming effect and also will not contribute to ozone depletion. York was appointed to the design team, alongside M&E contractor AMEC and engineering consultant PBX Power. The chillers will be located in T5’s energy centre. Ian Lilley, director of strategic initiatives,says, ‘Our integrated tender strategy brought together wide-ranging skills from our UK organisation and our specialist ammonia factory in Denmark. This significant development demonstrates York’s total design, manufacturing, service and maintenance capability to the European market.’
Related links:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.