Hattersley at Chelsea FC Academy

hattersley
A new training academy for Chelsea Football Club has the entire heating, ventilating and air-conditioning systems controlled by Hattersley valves. The £12million design-and-build project is a 3500 m2, 3-storey facility with changing rooms, hydrotherapy pools, treatment rooms, dining area, media centre and staff offices. Internal temperature control is a critical feature at the site and the HVAC control valves have had to meet a demanding specification. Hattersley valves are used in the boiler house and for commissioning and isolation throughout the offices and also serve the chillers on the roof.
Related links:



modbs tv logo

Government must do more to tackle heat pump and electric vehicle barriers, Which? says

Which? is calling on the government to provide more support for greener home heating and cars, as new research shows cost and other barriers are putting people off making the switch.

New study reveals job stress affects 70% of construction workers

A groundbreaking study conducted by researchers from the University of Cambridge has revealed that at least 70% of people in the construction industry report feeling stressed at work, and this not only has a negative impact on job performance but also personal life. The findings highlight the urgent need for effective strategies to combat workplace stress.