Buderus helps hotel reduce costs

Buderus boiler
On the recommendation of an energy survey, a hotel in Wales has reduced the running costs of heating and hot water by installing a new Buderus boiler.
Following an energy survey by the Government agency Resolve, a hotel near Bridgend has replaced two outdated heating and hot-water boilers with a modern Buderus system which is expected to pay for itself within two years. The agency recommended a complete new solution to meet the total needs of the 28-bedroom Coed-Y-Mwstwr Hotel in Coychurch. The new system has a GE315 cast-iron boiler with an output of 140 kW and a 4211 modular controls package. It meets the entire heating and hot-water needs of the hotel, whereas the previous system met only part of the need. The new system has dramatically reduced fuel costs, the boilerhouse is considerably cleaner, and the various extensions over the years are now fully integrated into a single heating system. Its efficiency enabled contractor L. D. Powles and the hotel to apply for a interest-free loan from the Carbon Trust.
For more information on this story, click here: Nov08, 101
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.