Rehau pipework offers ‘peak’ performance

Rehau pipework
Rehau has delivered over 10 000 m of its Rauthermex pre-insulated polymer pipework since it installed an unwinding machine at its UK plant in Blaenau, North Wales — enough to stretch to the top of the nearby Mount Snowdon. This pipework system for district heating comprises a carrier pipe in PE-Xa polymer, insulted with closed-cell polyurethane foam. It is being widely specified for use in district-heating schemes with condensing boilers or geothermal heat sources, where its longitudinal stability and high hydraulic performance give it a critical competitive advantage. The Blaenau factory has cut lead times in the UK compared with waiting for supplying from Germany.
For more information on this story, click here: Dec 08, 61
Related links:
Related articles:



modbs tv logo

Smart Buildings Show conference programme is now LIVE

The conference programme for Smart Buildings Show 2025 is now live and there’s a lot on offer from industry leading speakers who will debate emerging trends and provide a wealth of information to guide you towards efficiency in your buildings.

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.