York chiller lands at T5

Ammonia chiller
The first of four ammonia (R717) chillers supplied for Terminal 5 at Heathrow Airport by York is delivered. Rated at 6.6 MW, the chiller was delivered in three sections, winched into the T5 energy centre and then assembled. They will provide chilled water to meet the air-conditioning needs of the buildings. Ammonia was a specific requirement of the design team, which was looking for optimum in energy-efficient, environmentally aware cooling systems.
Related links:



modbs tv logo

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.

Engineering services alliance welcomes government consultation on retentions and late payments

Actuate UK, the engineering services alliance, has welcomed the new government consultation on reforming cash retentions and taking legislative measures against late payments to small businesses, as part of the new Small Business Plan unveiled on 31st July 2025.