Distribution boards can have integral energy meters installed

Wylex, submetering, sub-metering, distribution board

In response to the requirement in Part L2 of the Building Regulations to meter energy usage in non-domestic buildings, Wylex has launched a range of modified distribution boards rated at 125 A. The NHTN range can be fitted with a multi-function digital kWh meter within the enclosure.

To complement this range, a meter pack is available to enable a contractor to easily install an incoming standard check meter or MID-certified meter (for monitoring the resale of electricity). The pack includes everything needed to fit and connect the internal meter into the new board — including a DIN rail mounting plate, multi-function kWh meter, three current transformers and three protection fuses. There is also a complete numbered wiring loom and connections.

For more information on this story, click here:  May 2011, 160
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.