Danfoss ground-source heat pump exceeds expectations

Danfoss, ground source heat pump, space heating
The Danfoss ground-source heat pump installed to heat this new building at a Lancashire school has achieved a 10% better COP than predicted.

Data for a full year, including the harsh Winter of 2010/11 have shown that a heat pump at a school in Lancashire performed considerably better than expected. The Danfoss unit at Bowland High School in Grindleton achieved an average COP of 3.39, well ahead of the predicted 3.08.

The unit is a DHP-L 10 kW 3-phase unit with a 100 litre buffer tank. It heats the 187 m2 single-storey building via radiators and draws heat from the ground via two 250 m loops at a depth of a metre in an adjacent field.

As part of the project, the newly built music block has block cavity walls with 100 mm of insulation to achieve a U-value of 0.2 W/m2 K. The profiled metal deck roof is also highly insulated.

The system was specified by Andrew Kells, a mechanical design engineer with Lancashire County Council. A grant from the Low Carbon Buildings Programme helped with the cost of the system. Another reason for installing a heat pump was that the school was a hundred metres from the road and the cost of a new gas connection for this building would have been very expensive.

For more information on this story, click here:  June 2011, 130
Related links:
Related articles:



modbs tv logo

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.

Independent testing crucial to bridge retrofit confidence gap, BSRIA study reveals

New research from the Building Services Research and Intelligence Association (BSRIA) highlights a significant confidence gap between construction professionals and the general public regarding the effectiveness of building retrofits.