Legrand scores with the Seagulls

Legrand, Salamandre, electrical trunking
All the cable-management requirements of Brighton & Hove Albion’s new stadium have been met with equipment from Legrand.

Having won the contract for distribution board trunking assemblies for Brighton & Hove Albion’s, known as the Seagulls, new 22 500-capacity American Express Community Stadium, the Legrand team then secured the order for Swifts cable ladder and tray, Salamandre trunking and Swiftrack channel support. The initial order for the trunking assemblies was won on the basis of significant reductions in installation time.

Fitted around distribution boards before they are installed on site, the solution enables the board to be pre-wired internally, a prefabricated process that takes a day compared to three or four days on site.

The equipment was specified by NG Bailey in two separate orders.

David Oatt, senior contracts manager with NG Bailey, said, There is no argument that Legrand can deliver solutions for any element of a cable-management installation. The fact that they combine such a comprehensive product offering with so many innovative and time-saving solutions — such as the trunking assemblies used on this project — means that they are very difficult to overlook when it comes to cable-management specification.’

For more information on this story, click here: October 2011, 134
Related links:
Related articles:



modbs tv logo

EBSSA publishes Strategic Skills Plan

The Engineering and Building Services Skills Alliance (EBSSA) has published its strategic Sector Skills Plan, as part of the work undertaken by the Construction Mission Skills Board.

AI automation boosts efficiency at Polypipe Building Services’ manufacturing site

Polypipe Building Services has enhanced manufacturing efficiency, productivity and sustainability through a major programme of automation investment at its production facility in Aylesford.