Mikrofill updates the services for care home

Mikrofill, boiler, space heating

To protect the reliability of LPHW and HWS systems in a care home in Sheffield, Mikrofill supplied gas-fired condensing boilers for a localised plantroom and Extreme 300 l loading cylinders to meet the hot-water demand in each bungalow.

Run by Sheffield Health & Social Care Trust, Forest Close is a 60-bed unit divided into four bungalows that provide 24-hour inpatient care to support people with severe and enduring mental-health problems. The aim is to help people achieve their optimum level of recovery in a collaborative and flexible way.

A feasibility study prepared by building-services consultants A&P Dynamic Design of Sheffield identified that the existing LPHW and HWS systems, including controls, were at the end of their lifecycle. The decision was made to implement a new strategy and improve the efficiency of these circuits.

The Extreme cylinders maximise condensing performance from the primary plant and can produce over 2500 l/h of hot water at 60°C.

The equipment was installed by G. W. Dawes & Son of Sheffield.

For more information on this story, click here: March 2016, 115
Related links:
Related articles:



modbs tv logo

Industry urged to see Clean Heat Market Mechanism target as opportunity

The UK government has confirmed that the next phase of the Clean Heat Market Mechanism (CHMM) will set an 8% target for the proportion of heat pumps to fossil fuel boiler sales.

2025 CSA Awards winners announced

The Commissioning Specialists Association (CSA) returned to London on the evening of 2nd October for the staging of its 10th Annual Awards Ceremony.