Grundfos responds to call from call centre

Grundfos Pumps, quick fixes

Following an energy check by Grundfos on the cooling and heating pumps in a major telecommunications call centre in London, a pump-replacement programme was proposed to save 318 MWh a year with a return on investment of 2.8 years. The recommendations were accepted, and a rolling implementation programme implemented. Energy savings of over £30 000 have already been achieved.

The energy check assessed all the installed pump equipment and looked at the current and future demands of the system.

The subsequent reports showed that there was a lack of system control, and it was recommended that obsolete heating and cooling pumps were replaced with models from the Grundfos TPE and NBE variable-speed ranges.

For more information on this story, click here: September 2016, 84
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.