Carrier books successful project at Lambeth

Toshiba Carrier, TCUK, Lambeth Palace, library, AquaSnap, chillers, heat pumps

Precious books and manuscripts dating back nearly 1,000 years will be protected in controlled environmental conditions courtesy of high efficiency Carrier AquaSnap chillers and heat pumps in a new world-class library at Lambeth Palace, home of the Archbishop of Canterbury.

The new building, currently under construction within the grounds of Lambeth Palace on the South Bank of the River Thames, will house the priceless collection comprising over 4,600 manuscripts and 200,000 printed books stretching back to the 9th Century. They document over 1,000 years of ecclesiastical and cultural life of the Church of England and Great Britain, including the Gutenberg Bible with English illumination, which is believed to be the first printed book to arrive to England, as well as Elizabeth I's own prayer book.

Conditions for archive storage areas follow the recommendations of PD 5454, Guide for the Storage and Exhibition of Archival Materials, which requires a temperature of 8 degrees C during winter and 18 degrees in summer, with a Relative Humidity (RH) of 45%.

These conditions will be maintained as far as possible using a passive approach, with high levels of insulation and thermal inertia provided by the building fabric. Conditions will be constantly monitored and if they begin to drift outside pre-set limits, the HVAC equipment will be used to maintain temperatures and humidity levels.

For more information on this story, click here: November 2019, 120
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.