Viega Prevista meets the latest Water Regulation guidance

Viega Complies with regulation 4

Viega Prevista WC suites now comply with the Regulation 4 of the Water Supply (Water Fittings) Regulations of 1999 and have achieved certifications with WRAS and KIWA (KUKreg4).

To address industry concerns about potential backflow from WC cisterns into the mains supply, WRAS and KIWA have updated their acceptance criteria for approval of WC suites. Evidence suggests that in some cases existing backflow protections could be compromised and are allowing ‘blue water’ stored in WC cisterns to enter into the mains supply via the filling valve. The revised requirements are that a Type AG filling valve be installed inside the cistern to allow for a physical “air gap” between the lowest point of the water outlet and the critical water level.

Viega Complies with regulation 4 (2)
Related links:



modbs tv logo

Smart Buildings Show conference programme is now LIVE

The conference programme for Smart Buildings Show 2025 is now live and there’s a lot on offer from industry leading speakers who will debate emerging trends and provide a wealth of information to guide you towards efficiency in your buildings.

Rinnai UK launches applied products division

Rinnai is launching a new division - Rinnai Applied - which will be dedicated to the design, supply and service of larger HVAC units and systems that will meet the specific heating, ventilation, air conditioning and hot water demands of commercial and industrial premises.