New guidance announced

IOR Logo

The IOR has just released a new guidance note on the Pressure Equipment (Safety) Regulations and Pressure Equipment Directive (GN36) outlining the requirements for installers of RACHP systems. 

In the RACHP sector all the components are supplied by a manufacturer for site installation (assembly) by a specialist third party contractor who might not realise that they then become the manufacturer of the assembly (an integrated and functional whole) under PE(S)R. 

With the move to R32 and other A2L refrigerants, classified as PE(S)R group 1 fluid (“dangerous”), this moves many systems from SEP (sound engineering practice) or hazard category 1 into hazard category 2 or higher. 

Systems which are category 2 or higher must comply with the PE(S)R and must be assessed by an approved Conformity Assessment Body or under an assessment scheme which has been certified by a Conformity Assessment Body.

Additional guidance on pressure and PED are also available for FREE from the IOR web site. 

Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.