Wind energy supports RDM headquarters

Wind Turbine
Up to 30 kW of electricity can be generated by these two wind turbines at RDM’s headquarters in Glasgow.
Control and monitoring company RDM has installed two 20 m-high wind turbines at its Glasgow headquarters. They can deliver up to 30kW of electricity, more than enough for the night-time load, and enough for 60 to 70% of the day-time load. The company had to overcome concerns from the local authority about possible interference with radar serving Glasgow Airport a few miles away. Other energy-saving initiatives include installating air-conditioning condensing units in the warehouse to provide free heating. Common spaces such as toilets and corridors have movement sensors to turn off lights. The call centre has movement sensors over desks to turn off local lights in the evening.
Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).