JS Wright contract reaches new heights in London

JS Wright

Building-services contractor JS Wright has won a £3.5 million contract to fit out a major residential development in central London that includes a 27-storey tower (pictured). The company’s first deal with the London division of Barratt Homes involves 283 new-build properties making up the first phase of the Canada Water development in Southwark. Canada Water sites A3 and A4 comprise a series of apartment blocks from two to eight storeys and the tower block close to the Underground station.

JS Wright is providing co-ordinated installation drawings before installing the scheme’s direct heating system, which will run off an existing energy centre.

Heat interface units will be installed in each apartment — along with hot-water storage, hot- and cold-water services, heat recovery and sanitation.

Managing director Marcus Aniol says, ‘We are delighted to have been awarded our first contract with Barratt Homes for one of London’s most exciting new residential development. London now accounts for more than 70% of our business.’

Related links:
Related articles:



modbs tv logo

Built environment professionals remain positive on future of Net Zero

A recent survey by global climate tech firm IES has revealed that nearly three-quarters of UK built environment professionals believe achieving a Net Zero built environment by 2050 is within reach.

BESA research suggests clients are yet to engage with new building safety regime

Construction clients are failing to engage with the new building safety regime, according to research carried out by the Building Engineering Services Association (BESA).