Mikrofill takes care of natal services

Mikrofill, DHW, space heating

Heating and hot-water services for the Mermaid Maternity Retreat on King’s Road in Chelsea are provided by two wall-mounted condensing boilers supplied by Mikrofill and two Rapide Extreme HWS loading cylinders. This specialist non-medical maternity retreat provides a full range of support and wellbeing services. It is also a place to stay and be looked after before and after giving birth.

The change of use and redevelopment of the buildings required efficient plant with a compact footprint.

Designed by Freddie Brown Associates of Surrey, the installation comprises two 110 kW boilers, a Mikrovent low-loss header’ air and dirt separator and the two loading cylinders, which can supply over 5000 l/h at 60°C.The boilers have a total modulation of 14:1 to ensure efficient load matching.

The equipment was installed by Greenhill Air Conditioning of Dronfield.

For more information on this story, click here: Aug 2014, 129
Related links:
Related articles:



modbs tv logo

HS2 Code of Practice is good news for JIB members

High Speed Two Limited (HS2 Ltd) has released its Employee and Industrial Relations (EIR) Code of Practice (the Code), which brings significant advantages to Joint Industry Board (JIB) member companies looking to work on one of the most demanding and exciting transport projects in Europe.

Industry leaders gather at CIBSE’s Measuring Performance and Facilities Management conference

CIBSE’s Measuring Performance and Facilities Management conference recently brought together leading voices from across the built environment
to explore the evolving landscape of building performance and operational excellence.