Toshiba replaces air conditioning in Leeds office building

Toshiba, air conditioning

A replacement Toshiba air-conditioning system installed at Thorpe Park in Leeds is equipped with the new generation of touchscreen Smart Touch controllers (pictured). They give engineers and building managers immediate access to system controls, setpoints and a comprehensive range of diagnostic and analytical tools via a colour high-definition screen.

This open-plan building is cooled and heated by a Toshiba SHRM-i 3-pipe heat-recovery VRF system, with a 2-pipe SMMS-i VRF heat-pump system serving separate administration areas.

The system was supplied by Cool Designs and installed by HLA Services, It has five outdoor units with 47 indoor units, mainly ducted, delivering up to 416 kW of cooling.

It replaced an aging chilled-water systems.

The building has an open-plan multi-storey work space with a high central atrium. Cool Designs worked with HLA to produce detailed heat-load calculations and then created a system using Toshiba’s pipework and wiring software package.

Chris Oldroyd, who headed the project for CDL, explained, ‘The design plays to the respective strengths of Toshiba’s heat-pump and heat-recovery systems, making the most of the opportunity for heat recovery to reduce running costs and carbon emissions.’

For more information on this story, click here: Nov 2015, 125
Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.