Wieland delivers power for new primary school

Wieland has supplied its Metalynx2 modular wiring system and a range of components for lighting and power distribution for the new Marlborough Primary School in the Chelsea area of London. This 2-form-entry primary school replaces an old unsuitable Victorian building on the site, which has been demolished.

The new school is larger and provides 5668 m2 of space — including new halls, studio space, classrooms and a biodiversity roof. There is a multi-use games area on the top level.

All electrical work was overseen by PhoenixME, which specified the Metalynx system. Project manager Darren Davies said, ‘We are very familiar with the Wieland system, having used it on many projects. Metalynx2 is quick to install as all components arrive on site ready to connect, which is imperative when we are up against tight project deadlines. The system comes colour coded and polarised, which dismisses any chance of installation error.

‘The system is also circular, so it can be easily installed through fire barriers and stud walls.’

For more information on this story, click here: April 2017, 131
Related links:
Related articles:



modbs tv logo

Baxi survey reveals care home leaders need support to achieve heat decarbonisation goals

Baxi recently surveyed over 400 senior and middle management care home managers in both the private and public sector this summer in an effort to understand the enablers required to help decarbonise the sector.

CIBSE launches Society of Vertical Transportation to elevate standards worldwide

CIBSE has officially launched the Society of Vertical Transportation (SoVT), an international professional community for individuals and organisations working across the design, engineering, installation and innovation of lifts, escalators and emerging vertical mobility systems.