Wieland reflects on success in Dublin’s Dock

Wieland, modular wiring systems, Reflector, Dublin's Grand Canal Dock

A modular wiring system and connectors from Wieland Electric are integral components in the newly constructed Reflector building, a landmark office and residential development situated on Dublin’s Grand Canal Dock.

The Reflector, owned by Park Developments Group, is a six-storey over basement building that extends to over 123,000 sq. ft. and has been completed to the highest of standards that include LEED Gold V4 accreditation and A3 BER Certification.

Core Electrical designed and supplied the unique modular wiring system for the project, integrating an intelligent, modular lighting control system to fulfil the requirements of the brief. Core, Wieland’s exclusive distributor for building installation products across Ireland, utilised Wieland wiring systems to provide a fast, easy installation that would reduce installation costs and future-proof the building.

Use of a structured wiring system with ‘plug and play’ connectivity, supplied pre-tested and pre-assembled off site for easy connection, has been shown to generate savings of 70% in installation time resulting in a significant reduction in costs. The modular wiring and lighting control system at The Reflector has provided a solution that reaches the environmental and user comfort objectives of today’s modern office facilities to offer convenience, performance and futureproofing in one touch.

For more information on this story, click here: November 2018, 120
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.