Pumping right up for 34 years

When Whatley & Co from Pewsey in Wiltshire were called to a lift a borehole pump for a customer who was experiencing problems with their water supply, they checked their records and realised that they had fitted the original Grundfos submersible SP4 pump way back in 1983.

The 100m deep well and 1.5” rising main was required to pump continuously to serve a mixed farm, as well as 5 houses and a small airfield site with water. When the Whatley team arrived on site they were expecting to find, that after 34 years, the pump was failing. They were therefore surprised to find that the cause of the problem was a large hole in the galvanised rising main and did not lie with the pump which was still working and meeting all the required duties.

Despite being really impressed with the pump’s longevity, the decision was taken to replace it with a new Grundfos SP pump.

For more information on this story, click here: November 2017, 128
Related links:
Related articles:



modbs tv logo

BCIA welcomes tougher commercial building energy standards but calls for greater ambition across the wider sector

The Building Controls Industry Association (BCIA) has welcomed the government’s confirmation that privately rented non-domestic buildings over 1,000 square metres in England and Wales will be expected to achieve a minimum EPC B rating by 2031, describing the move as an important step forward in improving the energy performance of the UK’s commercial building stock.

GOLDBECK commits to three-year schools partnership to inspire Cardiff’s future construction talent

GOLDBECK has launched a new long-term education initiative in Cardiff, committing to support three local primary schools as part of a programme designed to introduce young children to enterprise, careers and the wider world of construction.