Pump House provides rooftop access

Pump House, rooftop access

Pump House has provided an external rooftop access ramp solution for a proposed route out of a building down onto the flat roof.

The solution had to be fully adjustable against typical flat roof falls, yet not penetrate the waterproofing below. Steelwork had to be hot dip galvanised whilst landings needed to offer good slip resistance. Pump House supplied a non-slip 8mm thick GRP sheet to the full extent of the landing areas.

The solution was supplied with full handrail and kick plates to all exposed sides to ensure safe passage of pedestrians and cargo.

Pump House prepared full working AutoCAD drawings for approval, prior to manufacture start. Once approved, the solution was manufactured in smaller landing modules which facilitated easier lifting and fitting by the installers on site. All modules were identified by number; which in-turn was cross referenced within an installation drawing that we supplied. This simplified the installation on the roof which in-turn provided a fast, unimpeded fitting of our solution in only four hours.

For more information on this story, click here: November 2017, 124
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.