Flexenergy offsite pipework proves its worth

Flexenergy

Flexenergy specialises in the supply and fabrication of pre-insulated pipe for heating, hot water and cooling systems. Their pipework was recently used in the scheduled replacement of a heating system integral to natural gas offtake in Wales. The off-site prefabrication approach assisted in significant cost-reductions on the project.

Flexenergy was called in by contractors Fowler Gas technical, onsite support and assistance in replacing the heating main at Wales & West Utilities’ North Wales natural gas offtake in Wrexham. The use of heat exchangers warms the natural gas as it reaches the offtake so it can be effectively odourised and distributed to heat homes and power businesses right across North Wales.

The four heat exchangers on site needed to be served with a flow and return on each side of the exchanger to allow for balancing and Flexenergy’s Flexalen 600 pre-insulated pipe was selected for its thermal properties, eco credentials and jointing integrity.

Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.