A Vision in radiant heating

ambirad
Radiant heaters from AmbiRad’s new Vision range have replaced oil-fired warm-air heating in this steel-products factory in Kingswinford.
AmbiRad Vision radiant-tube heaters have replaced an oil-fed warm-air system in the factory of steel-products manufacturer Troax. Not only do these heaters provide zoned heating in this 3500 m2 high-roof building, but they also control condensation to keep stored steel dry and prevent rust. This factory at Kingswinford, West Midlands, is divided into four bays. It produces steel partitioning and doors for offices, warehouses and factories. It also has a powder-coating section. Four VSX radiant-tube heaters were installed in the roof space above two production bays. A herringbone configuration allows flueing straight to atmosphere, eliminating the possibility of condensation building up. The heaters take less than 30 minutes to bring the working temperature up to 22°C, delivering heat to where people are working — in the lowest 2 m of the building. Jim Wareham, production manager of Troax, says, ‘With so much steel in stock, it tends to be very cold in the factory. The AmbiRad Vision heaters combat the cold very effectively.
For more information on this story, click here:Jan 08, 143
Related links:
Related articles:



modbs tv logo

ICOM celebrates Noah Gaunt as Apprentice of the Year 2026

Noah Gaunt of Vaillant Group UK has been named ICOM’s Apprentice of the Year 2026, recognising his outstanding commitment, technical excellence and passion for advancing the future of low carbon heating.

BCIA warns non-domestic buildings risk being overlooked despite decarbonisation drive

Commercial and public buildings risk being left behind in the UK’s transition to Net Zero despite more than £40 billion of funding, investment and policy support being directed towards building decarbonisation, according to the latest Policy Pulse report from the Building Controls Industry Association (BCIA).